Acme will be submitting a Subcontractor Quote for work on the PDX North Ramp RON Parking Reconstruction for the following bid items:

Item No.             Item Description                                Est Qty.                     Units

30                       15″ Thick Concr Pavement                 440                             SY

31                       19″ Thick Concr Pavement                 30790                         SY

 

Project Details

Reconstruction of an existing general aviation area and construction of a new Remain Over Night
(RON) airplane parking area. The work includes demolition of the Business Aviation Terminal
(BAT) building utilities (above and below ground) and building foundations, and construction of
a new full-depth concrete and asphalt airplane parking surface with high-mast lighting, security
cameras, security fencing, a new stormwater system with three emergency shutoff valves, and a
fire water system.

A pre-bid meeting will be held at 9 a.m. December 17, 2019, in the Anchor Room on the first floor of
the Port of Portland Headquarters Building, 7200 N.E. Airport Way, Portland, Oregon, to discuss all
phases of the work. From Airport Way, follow the signs to park in the long-term parking garage. Use the
garage elevators at the east end of the garage to enter the Headquarters Building at the first floor level.
Parking validation is not available. A site tour will immediately follow the meeting.