Acme will be submitting a Subcontractor Quote for work on the PDX Southeast Taxiway T Rehabilitation.
Rehabilitation of Taxiway T from the intersection of Exit B5 to the intersection with Taxiway B to the east, as well as widening the existing asphalt shoulder along Taxiway B from 15 feet to 30 feet between Exit B5 and B8. The work includes asphalt mill and inlay at certain locations and full-depth asphalt construction; installing a new storm water conveyance system; reconfiguring gate locations north of the taxiway; electrical lighting and signage; infield grading; and pavement marking.