Spokane, WA 509-242-1234 Call Us Email Us Request Estimate

PDX SE Taxiway T Rehab

Loading Events
This event has passed.

Acme will be submitting a Subcontractor Quote for work on the PDX Southeast Taxiway T Rehabilitation.

Rehabilitation of Taxiway T from the intersection of Exit B5 to the intersection with Taxiway B to the east, as well as widening the existing asphalt shoulder along Taxiway B from 15 feet to 30 feet between Exit B5 and B8. The work includes asphalt mill and inlay at certain locations and full-depth asphalt construction; installing a new storm water conveyance system; reconfiguring gate locations north of the taxiway; electrical lighting and signage; infield grading; and pavement marking.